Project Information
Engineering services for a new 8,200 sf upper level floor suite addition, plus renovation to the original building clubhouse, including a full kitchen remodel. $2.5 million construction cost.
The existing HVAC system was replaced with a Central system monitored by a new building management system.
Mechanical engineering design included geothermal heating, ventilation and air conditioning design to meet ASHRAE standards, plumbing design including domestic water, sanitary sewer, gas piping, and roof storm water drainage systems.
Electrical engineering design included site lighting design, interior power distribution design, emergency power for the entire building, interior lighting design including branch circuiting and switching, interior telephone and data processing system provisions, and fire alarm system design.