Comprehensive Engineering

  • Home
  • About
  • Services
  • Projects
  • State Licensing
  • Careers
  • Contact

Port Austin Marina – Phase 1

Phase 1, new shore power for 23 slips on the east pier with new Eaton “Lighthouse” pedestals according to DNR requirements with 30 and 50 amp receptacles.

Also included was power for the existing fuel building and new sign lighting at the pier end.

Pedestals have LED lighting and wireless electric metering.

Feeders serving the pedestals are protected with a “Marina Guard” GFI sensing system to reduce the possibility of electrocution.

Also, included was the design of a new community toilet building on the site with daylight harvesting, occupancy sensor lighting controls and a security system that automatically locks the building down at night.

Our Office

Comprehensive Engineering
4650 Plainfield Ave NE, Suite A
Grand Rapids MI 49525

Contact Us

616-365-9933
Contact Page

Directions

For directions to our office

Google Maps icon Google Maps
Google Streetview iconStreet View

Web design by OptimWise