Engineering services for new fixed 1.5T MRI addition to the South Pavilion surgical facility
A temporary Mobile MRI dock was designed and constructed prior to starting the fixed MRI
MRI addition which was completed in 6 months
Special vibration isolation foundation system for the MRI equipment
Special copper shielding enclosure for the MRI room
Mechanical systems provide for temperature and humidity, medical gasses, and pre-action dry pipe fire suppression system
Electrical systems include lighting design with motion detection, power distribution with branch circuiting, nurse call systems, music system, emergency generator power, security and fire alarm, and a DC dimming system