St. Christopher’s Episcopal Church

New 17,200 square foot facility including Worship Space, Social Hall, Classrooms and Offices. Construction cost $3.5 million.

Structural Engineering included custom gluelam timber trusses with structural insulated panel roof system

Mechanical Engineering included central air handling unit with a chiller and boiler plant and Fire protection sprinkler system throughout the facility.

Electrical Engineering included power, lighting and lightning protection systems

Frontline Church

Renovation of the main building entry area, exterior building materials and site improvements of an existing building to provide a fresh new look to an existing facility. Comprehensive Engineering provided the structural, site and electrical engineering design.

The building renovations include construction of a new canopy over the main entry, mansard, new lighting, a shade structure adjacent to the main entry and exterior painting.

The facility is located on a 11 acre site consisting of building, asphalt pavement and very little green space. The site improvements includes removal and replacement of 3.2 acres of asphalt paving and concrete walkways, adding greenspace around the building and within the interior areas of the pavement, grading to provide barrier free accessibility, storm sewer improvements, new landscaping plantings and grass areas and site lighting improvements.

Construction cost was $750,000.

Community Bible Church

The project is a renovation of an existing elementary school located on a 15 acre site to become the new home for Community Bible Church. The renovations included a 2,800 square foot addition to create the new sanctuary, 29,000 square foot new paved parking area for 75 parking spaces, interior electrical and mechanical modifications. Total construction cost $800,000.

The site modifications included layout, pavement, stormwater management per Wayne County stormwater standards and fire protection service main to public utility design.  Provided documentation and coordination to obtain site plan approval by the City of Trenton Planning Commission.

The structural modifications included concrete slab on grade,footings, steel and block frame structure with I-joint roof construction design.

Holy Childhood of Jesus Catholic Church

$2.3 million renovation and addition to existing church constructed in late 1800’s.

Worship space was doubled in size without changing the appearance of the original facility from Main Street.

Structural analysis of existing heavy timber roof trusses revealed that the entire existing roof structure needed to be removed and replaced.

Mechanical engineering included HVAC design, boiler replacement, and a new snow melt system in the sidewalks.

Electrical engineering included interior power distribution, circuiting for lighting, telephone and data provisions, fire alarm design and lightning protection design.

Our Office

Comprehensive Engineering
4650 Plainfield Ave NE, Suite A
Grand Rapids MI 49525

Contact Us

616-365-9933
Contact Page

Directions

For directions to our office

Google Maps icon Google Maps
Google Streetview iconStreet View

Web design by OptimWise