Project Information
Renovation of the main building entry area, exterior building materials and site improvements of an existing building to provide a fresh new look to an existing facility. Comprehensive Engineering provided the structural, site and electrical engineering design.
The building renovations include construction of a new canopy over the main entry, mansard, new lighting, a shade structure adjacent to the main entry and exterior painting.
The facility is located on a 11 acre site consisting of building, asphalt pavement and very little green space. The site improvements includes removal and replacement of 3.2 acres of asphalt paving and concrete walkways, adding greenspace around the building and within the interior areas of the pavement, grading to provide barrier free accessibility, storm sewer improvements, new landscaping plantings and grass areas and site lighting improvements.
Construction cost was $750,000.