Comprehensive Engineering

  • Home
  • About
  • Services
  • Projects
  • State Licensing
  • Careers
  • Contact

Grand Rapids Public Schools Lincoln Campus

Project Information

Location

Grand Rapids, MI

Project Services

  • Electrical Engineering
  • Mechanical Engineering

Project Type

  • Education

The project included the separation of domestic hot water (DHW) and pool heating systems at both the main and LDC buildings. DHW heater replacement at the KVO building DHW heater replacement at the powerhouse building.

Air system duct repairs and/or replacement, primary cooling pump replacement, control of cooling pumps, piping and insulation repairs and/or replacement, primary heating pump replacement and control of heating pumps

Boiler replacement in the powerhouse building, and re-balancing of all air/water systems. Services also included attending construction progress meeting and construction administration services.

Our Office

Comprehensive Engineering
4650 Plainfield Ave NE, Suite A
Grand Rapids MI 49525

Contact Us

616-365-9933
Contact Page

Directions

For directions to our office

Google Maps icon Google Maps
Google Streetview iconStreet View

Web design by OptimWise