Project Information
Comprehensive Engineering’s involvement in the Fredrik Meijer Gardens Amphitheater project consisted of specialized structural engineering, centering on a custom bowstring truss with a 90 foot clear span. To allow for changes in length due to thermal expansion slide bearing connections were utilized. Structural items related to concrete included durable epoxy coated reinforcement and a special sand blast finish.